Bid Writing

Supporting successful bid writing for schools, trusts and public-sector organisations with clear, focused and compelling funding applications.

Our Bid Writing Services

Condition Improvement
Fund

CIF provides annual capital funding to help eligible schools and sixth-form colleges address condition needs, improve building safety and keep facilities compliant and fit for purpose. It is commonly used for projects such as roofing, heating, safeguarding, compliance and essential building fabric works.

School Rebuilding
Programme

The School Rebuilding Programme supports major rebuilding or refurbishment projects for schools and sixth-form colleges with buildings in very poor condition, where significant long-term investment is required. It is focused on sites where rebuilding or major refurbishment is likely to be the most appropriate solution.

Urgent Capital
Support

Urgent Capital Support is for serious building condition issues that pose an immediate risk to health and safety or could result in the closure of all or part of a school. It is intended for urgent situations that cannot wait for the next suitable funding round.

Post-16 Capacity Fund

Post-16 Capacity Funding supports eligible education providers to create additional space for 16 to 19 learners where there is expected demographic growth and existing capacity is not sufficient. It can help fund new or improved teaching spaces, specialist facilities and wider estate changes needed to accommodate additional students.

Salix

Salix funding supports public-sector organisations with decarbonisation projects, including low-carbon heating and energy-efficiency improvements that help reduce carbon emissions across their estate. It is particularly suited to projects replacing end-of-life fossil-fuel heating systems with more sustainable alternatives.

How We Support Your Application

Why Evidence Matters

An old, multi-story building with yellow and peeling paint, broken windows, and exposed brickwork. Several electrical wires are crisscrossed in front of the building under an overcast sky.

Strong evidence is one of the most important parts of any funding application. It helps demonstrate why the project is needed, how urgent the issue is, and why the proposed works are the right solution.

A clear, well-supported application gives funders confidence that the project has been properly considered, accurately costed and can be delivered successfully. Evidence such as condition surveys, photographs, professional reports, maintenance records, incident logs and supporting letters can all help strengthen the case.

At WMC Partnership, we work with you to identify the most relevant evidence for your project. Where needed, we can arrange surveys, visit site, take photographs, gather supporting information and coordinate costings to help create a clear, credible and evidence-led submission.

Some of Our Success Stories

  • A modern multi-story building with large windows, surrounded by trees, children playing soccer on a grassy field, and benches with people sitting on them.

    Post 16 Capacity Fund

    We successfully secured a £1.1m grant for a college, supporting the creation of nine new classrooms, a dance studioand a purpose-built gym.We were delighted to project manage the build through to completion, with the new facilities opening in late 2023 and providing the college with modern, flexible spaces to support teaching, performance and physical education.

  • Two industrial water treatment or filtration machines labeled 'Ideal Falcon3 ST' in a utility room, with a small orange device in front of each machine.

    Condition Improvement Fund

    Following a successful funding bid, we recently completed a £500k heating project in Cornwall, replacing life-expired boilers with a new air source heat pump system.

    The project has provided the primary school with a modern, efficient and more sustainable heating solution, helping ensure reliable heating throughout the year while reducing reliance on older fossil-fuel systems.

  • Rooftop under construction with scaffolding, roofing materials, and a cloudy sky.

    Urgent Capital Support

    We recently completed a UCS project in late 2025 to address significant structural issues within a school building.The works included partial wall reconstruction, full elevation recladding, new windows and internal decoration, restoring the affected areas to a safe, compliant and usable condition.

    Learn more on our projects page.

  • An aerial view of a construction site with metal framework being assembled for a building, surrounded by roads and lush green trees.

    School Rebuilding Programme

    We recently secured funding through the School Rebuilding Programme for a school in London. While we were not appointed to project manage the build itself, we are proud of the role our bid played in supporting significant future investment into the school site.

  • Three white boilers or heat exchangers connected to copper piping and industrial equipment, with black tanks below and control panels on the wall.

    Salix

    We recently secured a £311k Salix grant for a decarbonisation scheme in Yeovil, supporting works to improve the sustainability and carbon performance of a community building.

    The funding has enabled targeted improvements that will help reduce carbon emissions, improve energy efficiency and create a more resilient building for long-term community use.

Still Have Questions?

Whether you are preparing for CIF, Salix, Urgent Capital Support or the School Rebuilding Programme, WMC Partnership can help you understand your options and prepare a strong, evidence-led application.

Get in touch to discuss how we can support your next funding bid at info@wmcpartnership.co.uk, or;